0.1-seed

over 2 years late (02/15/2010)

All the features necessary for the seed group to start using the system for real

40%

41 closed (41%)   58 open (59%)

Time tracking
Estimated time 2.50 hours
Spent time 0.00 hour
Issues by
Culture

1/1

Currency design

2/5

Feature

0/2

Process

1/1

Usability

6/11